9 ms·
Even after all those delays and teething issues the Dreamliner was passed under a very compressed schedule, said Mann. "And there was an electrical failure and
by wildranter 14y ago
Even after all those delays and teething issues the Dreamliner was passed under a very compressed schedule, said Mann. "And there was an electrical failure and an emergency landing during the test-flight programme," he said. "That was blamed on a 'foreign object'."
The whole aircraft apparently. And there lies the solution to this riddle. Boeing went too far outsourcing engineering. Is Boeing trying to copy Airbus, and If so, why?