9 ms·
> It would require a technological breakthrough that we have not yet imagined. Maybe, but not necessarily. The necessary breakthrough might have been high-temp
by apendleton 11mo ago
> It would require a technological breakthrough that we have not yet imagined.
Maybe, but not necessarily. The necessary breakthrough might have been high-temperature superconducting magnets, in which case not only has it been imagined, but it has already occurred, and we're just waiting for the engineering atop that breakthrough to progress enough to demonstrate a working prototype (the magnets have been demonstrated but a complete reactor using them hasn't yet).
Or it might be that the attempts at building such a prototype don't pan out, and some other breakthrough is indeed needed. It'll probably be a couple of years until we know for sure, but at this point I don't think there's enough data to say one way or the other.
> And already, solar plus storage is cheaper than new nuclear.
It depends how much storage you mean. If you're only worried about sub-24h load-shifting (like, enough to handle a day/night cycle on a sunny day), this is certainly true. If you care about having enough to cover for extended bad weather, or worse yet, for seasonal load-shifting (banking power in the summer to cover the winter), the economics of solar plus storage remain abysmal: the additional batteries you need cost just as much as the ones you needed for daily coverage, but get cycled way less and so are much harder to pay for. If the plan is to use solar and storage for _all generation_, though, that's the number that matters. Comparing LCoE of solar plus daily storage with the LCoE of fixed-firm or on-demand generation is apples-and-oranges.
I think solar plus storage absolutely has the potential to get there, but that too will likely require fundamental breakthroughs (probably in the form of much cheaper storage: perhaps something like Form Energy's iron-air batteries).
- deleted 11mo ago[deleted]
- pfdietz 11mo agoHigh temperature superconducting magnets are not a panacea for the problems with DT fusion. Those issues follow from limits on power/area at the first wall, and the needed thickness of the first wall; these ensure DT reactors will have low volumetric power density, regardless of the confinement scheme used. With HTSC magnets, a tokamak much smaller than ITER could be built, but ITER is so horrifically bad that one can be much better than it and still be impractical.
- epistasis 11mo agoAnd these are not new issues, they've been known for more than 40 years, but never addressed. From the 1983 Led > But even though radiation damage rates and heat transfer requirements are much more severe in a fusion reactor, the power density is only one-tenth as large. This is a strong indication that fusion would be substantially more expensive than fission because, to put it simply, greater effort would be required to produce less power. https://orcutt.net/weblog/wp-content/uploads/2015/08/The-Trouble-With-Fusion_MIT_Tech_Review_1983.pdf https://orcutt.net/weblog/wp-content/uploads/2015/08/The-Tro...
- apendleton 11mo agoIn terms of cost of materials to build a reactor, sure, that seems right. But most of the cost of fission is dealing with its regulatory burden, and fusion seems on track to largely avoid the worst of that. It seems conceivable that it ends up being cheaper for entirely political/bureaucratic reasons.
- pfdietz 11mo agoRelaxed regulatory burden doesn't seem to be making fission competitive in China; renewables are greatly overwhelming it now, particularly solar. We might ask why regulations are so putatively damaging to nuclear, when they aren't to civil aviation. One possibility is that aircraft are simply easier to retrofit when design flaws are found. If there's a problem with welding in a nuclear plant (for example) it's extremely difficult to repair. Witness the fiasco of Flamanville 3 in France, the EPR plant that went many times over budget. What would this imply for fusion? Nothing good. A fusion reactor is very complex, and any design flaw in the hot part will be extremely difficult to fix, as no hands on access will be allowed after the thing has started operation, due to induced radioactivity. This includes design or manufacturing flaws that cause mere operations problems, like leaks in cooling channels, not just flaws that might present public safety risks (if any could exist.) The operator will view a smaller problem that renders their plant unusable nearly as bad as a larger problem that also threatens the public. I was struck by a recent analysis of deterioration of the tritium breeding blanket that just went ahead and assumed there were no initial cracks in the welded structure more than a certain very small size. Guaranteeing quality of all the welds in a very large complex fusion reactor, an order of magnitude or more larger than a fission reactor of the same power output, sounds like a recipe for extreme cost.
- adrianN 11mo agoIn the end we're still making steam and running a turbine. Just the steam turbine part of the power plant has a hard time competing with solar in sunny locations.
- bruce511 11mo agoOne can discuss base load and season shifting all day long. But ultimately fusion will fail for two simple reasons; time and money. If we started building a fusion commercial scale plant today (ie started by planning, permits, environmental assessments, public consultation, inevitable lawsuits, never mind actual construction and provisioning) it'd come online in what? 10 years? 15 years? 20 years? Want to deploy more batteries? It can be online in months. And needs no more construction than a warehouse. Financially fusion requires hundreds of billions, committed now, with revenue (not returns) projected at 10 years away (which will slide.) Whereas solar + storage (lots and lots of storage) requires anything from thousands to billions depending on how much you want to spend. We can start tomorrow, it'll be online in less than 2 years (probably a lot less) and since running costs are basically 0, immediate revenue means immediate returns. Of course I'm not even allowing for fusion being "10 years" from "ready". It's been 10 years from ready for 50 years. By the time it is ready, much less the time before it comes online, it'll be redundant. And no one will be putting up the cash to build one.
- cesarb 11mo ago> If the plan is to use solar and storage for _all generation_, though, that's the number that matters. And that's the problem with these Internet discussions: that's almost never the plan, but commenters trying to make solar look bad assume it is (to your credit, you made it explicit; many commenters treat it as an unspoken assumption). In real life, solar and batteries is almost always combined with other forms of generation (and other forms of storage like pumped hydro), in large part due to being added to an already existing large-scale grid. The numbers that matter are for a combination of existing generation (thermal power plants, large-scale hydro, etc) with solar plus storage. Adding batteries for just a few hours of solar power is enough to mitigate the most negative consequences of adding solar to the mix (non-peaking thermal power plants do not like being cycled too fast, but solar has a fast reduction of generation when the sun goes down; batteries can smooth that curve by releasing power they stored during the mid-day peak).