You need to run plumbing through the floors to every unit. The floors are structural.
by grp000 4y ago
You need to run plumbing through the floors to every unit. The floors are structural.
- quickthrowman 4y agoYou can drill dozens of 10” holes through a concrete floor in a commercial office tower. The structural part of the floor are the tensioned cables inside the concrete, as long as you dont’t sever those, you can drill a ton of holes without impacting the structural integrity. https://en.m.wikipedia.org/wiki/Prestressed_concrete https://en.m.wikipedia.org/wiki/Prestressed_concrete
- grp000 4y agoI used to work in concrete construction, doing post tensioned and SOMD for elevated slab. Coring might be simpler for SOMD, but post tensioned has such a high density of cables that I don't think it would work.
- loonster 4y agoCommercial buildings tend to have very high ceilings. Maybe build a raised floor and put the plumbing under there.
- tzs 4y agoCould you run vertical pipes on the outside in back of the building, and run horizontal pipes through space between adjacent apartments that you specifically leave for that purpose when converting the interior? If you need intermediate pumping stations or holding tanks due to the height of the building, those could be inside adjacent to the outside pipes.