5 ms·
Is this actually how it is done? I would assume that the complete ENTSO-E grid cannot be perfectly phase-synchronous anyway, simply due to the physical dimensio
by Knemejic 5y ago
Is this actually how it is done? I would assume that the complete ENTSO-E grid cannot be perfectly phase-synchronous anyway, simply due to the physical dimension of the grid and the speed of light.
I would have guessed that frequency-synchronicity is sufficient for coupling two grids, and then you could use something like a phase shifting transformer to control the power flow?
- ars 5y agoI looked into this once, and they .... just don't worry about it. Each generator just matches whatever it sees. If you are trying to match two other generators (like in a triangle, and due to the speed of light it's impossible for all to be perfectly in sync), then it matches to an average of the two, and apparently that works.
- 323 5y agoSome country interconnections, in particular those to UK and Nordic countries, have the ability to connect even unmatched phases, by for example converting to and from DC (AC -> DC -> AC).
- aerostable_slug 5y agoThis was how the Tres Amigas Superstation was supposed to work. Unfortunately, ERCOT decided they didn't want to be subject to the same regulations as the Eastern and Western interconnects, so the project collapsed.
- lxgr 5y agoAustria and the Czech Republic (Czechoslovakia at the time) used to have one of these too: https://en.wikipedia.org/wiki/GK_D%C3%BCrnrohr https://en.wikipedia.org/wiki/GK_D%C3%BCrnrohr
- sebazzz 5y agoThat ability to connect unmatched phases is secondary to the primary function of those interconnects: over those distances it is more efficient to transmit the power in DC instead of AC. [0] [0]: https://en.wikipedia.org/wiki/High-voltage_direct_current#Advantages https://en.wikipedia.org/wiki/High-voltage_direct_current#Ad...
- jamincan 5y agoSometimes connecting unsynchronized grids is the primary reason. The Outaouais HVDC Intertie is only about 35km long, but it allows the import and export of electricity between Ontario and Quebec.
- martin8412 5y agoEven more fun is that Denmark despite its' very tiny size is split in two when it comes to electricity. West Denmark is connected with East Denmark through HVDC.
- WJW 5y agoAs far as I'm aware this is how grid operations are done in the overwhelming majority of the world. You spin a generator up to speed, match phases and close the switch to connect it to the rest of the network. Due to how electricity works, if any connected generator is slightly out of phase with the rest that will generate currents causing it to pulled back into phase in a closed feedback loop. So while it is technically possible for a generator to be out of phase with the network, it can never be outside of phase for very long because literally all the other generators on the network are pulling it back into phase. If the grids are particularly far from each other and/or with differing frequencies, a DC high voltage line can be used instead but that is certainly not the most used method.
- numpad0 5y agoSounds like needs to be consistent within each subgraphs of grids and synchronous at connection points
- Armisael16 5y agoYou only need to match phase at the connection point, so the phase of the grid in France doesn't really matter (as long as ENTSO-E isn't destroying itself before you do anything). This does get much trickier if you have multiple connection points and it is impossible to be synchronized at all of them because the in-grid distance between the two points is different on the two grids. Then you definitely do need fancier tricks.
- tremon 5y agoTrue, but you need to have a very large unbalanced grid for that to occur: at the grid frequency (50 Hz), the corresponding wavelength is 6000 kilometer. So assuming that math is correct, you would need a path length difference of 3000km between two transformers to get full phase inversion between the paths. That's more than twice the max diameter of the entire European grid (Tunesia-Gibraltar-Turkey seems the longest path). So as long as there's transformers every few hundred kilometer, and multiple paths between most of the connection points, the overall phase synchronization should be adequate to not need those fancier tricks.