Excellent points to add to this discussion. One must always weigh the time it would take clean things up. I think the main point I was trying to make with my p
by cdevroe 16y ago
Excellent points to add to this discussion. One must always weigh the time it would take clean things up.
I think the main point I was trying to make with my post was; a lot of times it would take less time to just fix things than it would be to ask for permission to do so.
- Stormbringer 16y agoThe corrollary of this is that it almost always takes longer to explain to a Project Manager why something isn't done yet/can't be done/shouldn't be done that way (etc) than it would do just to finish it or do it another way or do it properly (as the case may be).