7 ms·
Is this for real? They are basically getting orgasms just because someone drills a tunnel, which is indeed revolutionary for public transportation... And it tra
by martamoreno2 7y ago
Is this for real? They are basically getting orgasms just because someone drills a tunnel, which is indeed revolutionary for public transportation... And it transports a whopping 4500 people per hour, will you think of that! That is almost as much as a normal, 100 year old subway train can do in a few minutes.
- deleted 7y ago[deleted]
- m463 7y agoDon't subways and other rail projects routinely cost a billion dollars? https://www.citylab.com/transportation/2018/01/why-its-so-expensive-to-build-urban-rail-in-the-us/551408/ https://www.citylab.com/transportation/2018/01/why-its-so-ex...
- aris85 7y agoLol silly White Worlder, this is a Black Project what you are unaware is that Elon is using Nuclear Tunnel Boring Machines (NTBM) no wonder they keep you blind and living under the veil
- asdff 7y agoAbout as much capacity as a bus lane for point of reference. I wonder what is cheaper: a can of paint, or boring into the living earth?
- adrianN 7y agoIn terms of political capital it's probably cheaper to bore a tunnel than to take away a lane for cars.
- ilitirit 7y agoI don't know a lot about the background of this project or the region. Why has it taken this long for a tunnel to be built in LV? Was/is it not considered necessary?
- Traster 7y agoIt's pretty much misleading to describe this as a Los Vegas tunnel to be honest. What they're actually doing is building a small shuttle system to get from one side of a convention centre to the other. The total length of the tunnel will be 1 mile. So in terms of what this project does, it's best compared to the sorts of bus systems, monorails, and light rail systems that airports use to transport people from one terminal to another. There's a reason these small funky transit systems are only used on small scales. It's not comparable to real mass transit systems used on the scale of a city and the length of the tunnel means that the public really can't view the cost of this as comparable to the cost of a real Subway system tunnel or road tunnel. The relevance of the project for TBC is that they're going to learn from it, but for the rest of us it's really not going to be that interesting.