5 ms·
That reminds me of this story about removing empty boxes from a production line. https://userweb.cs.txstate.edu/~br02/cs1428/ShortStoryForEngineers.htm https:/
by Wiles_7 8y ago
That reminds me of this story about removing empty boxes from a production line.
https://userweb.cs.txstate.edu/~br02/cs1428/ShortStoryForEngineers.htm https://userweb.cs.txstate.edu/~br02/cs1428/ShortStoryForEng...
- EADGBE 8y ago> and six months (and $8 million) later a fantastic solution was delivered — on time, on budget, high quality and everyone in the project had a great time. I don't believe this story
- gmiller123456 8y agoFunny, but obviously not real. If the guys were tired of "tired of walking over every time the bell rang", the number of defects detected wouldn't be 0.
- brokenmachine 8y ago1.Bell is ringing too much and people are tired of walking over: defects > 0 2.Put fan there to blow empty boxes: now defects == 0 I don't see the problem.
- BioMeditate 8y agoYea you would put the fan before the check point so the line doesn't stop.